BLUEPRINT COLUMBUS – Clean Streams, Strong Neighborhoods: "One of the most exciting aspects to Blueprint is its creativity. Blueprint attacks the root problem by addressing the rain water that is entering the sewer system," stated Columbus Mayor Michael B. Coleman
“The City was concerned that building 28 miles of tunnels to eliminate Sanitary Sewer Overflows (SSOs) was of questionable value, because SSOs are such a small volume of overflows compared to Combined Sewer Overflows (CSOs). The proposed tunnels would cost approximately $2 billion and only be used 4 or 5 times a year,” stated Mayor Michael Coleman. “Blueprint Columbus will be significantly better for the environment.”