CHRONICLE OF GREEN INFRASTRUCTURE FOR PERIOD FROM 2018 THRU 2024: The Lower Mainland and east coast of Vancouver Island once again face Critical Choices: Will it be development that controls us or development that sustains us? – this is an overarching question for a livable region

Note to Reader:

Waterbucket eNews celebrates the leadership of individuals and organizations who are guided by the Living Water Smart vision.  The edition of Waterbucket eNews published on October 13, 2026 introduced the sixth installment of the Chronicle of Green Infrastructure Innovation in Metro Vancouver.

Part F covers the period 2018 through 2024. This sweeping narrative weaves quotable quotes to provide the reader with a perspective regarding four themes guiding an ecosystem-based strategy for land redevelopment. The following extract is from Section 1 of Part F and is the 3rd in a set of 4 extracts. Section 1 is titled Intergenerational Mission for implementing an Ecosystem-Based Approach.

 

Critical Choices for Metro Vancouver Region

“The issues facing communities in the 2020s are no different than they were in the 2000s and 2100s. Population growth, housing affordability, weather extremes. Everything in a system is connected. The issues just grow more complex and more urgent with each passing decade,” wrote Kim Stephens, author of the Green Infrastructure Chronicle and Executive Director with the Partnership for Water Sustainability in BC.

 

 

“Whereas Parts C through E describe milestones year-by-year from 1994 through 2017 to paint a picture of how processes evolve, we take a different tack in this Part F which covers the years 2018 through 2024.”

 

 

“Part F describes how this outcome is achievable through the streams and trees component of the Draft Liquid Waste Management Plan, known by the acronym LWMP, which the regional board approved in November 2024.”

Timeline and Milestones

The Timeline presented in Part F of the Chronicle identifies 16 major milestones for the convening for action storyline during the years 2018 through 2024. The purpose of the Timeline is to illustrate history at a glance.

14 of the 16 are inter-regional in scope. The other two, the WBM Desktop and the Green Infrastructure community-of-practice, are included only as reference points. Neither has yet to result in something of material impact.

 

COLOUR CODE: yellow represents inter-regional in scope and white is specific to Metro Vancouver

To Learn More:

The Partnership has its roots in government but is not government. Conceived as a solution to loss of continuity in government, the Partnership preserves institutional memory. This allows us to shed light on the WHAT, WHY and HOW of water-centric policies and their implementation history.

Waterbucket eNews stories are structured in three parts: One-Minute Takeaway, Editor’s Perspective and Context for Busy Reader, and the Story Behind the Story. To read the complete 3-part storyline, download a PDF copy of Living Water Smart in British Columbia: Critical Choices – Development that controls us or development that sustains us?

 

DOWNLOAD A COPY: https://waterbucket.ca/lws/wp-content/uploads/sites/14/2026/10/PWSBC_Living-Water-Smart_Green-Inftastructure-Chronicle-Critical-Choices_2026_including-Part-F.pdf