Convening for Action in the
Metro Vancouver Region
During the period 2003 through 2010, the Green Infrastructure Partnership (GIP) played a prominent role in leading change and assisting with implementation of the Water Sustainability Action Plan, primarily in the Metro Vancouver region, and also on Vancouver Island.
“Green infrastructure practices have moved from pilot project to neighbourhood and watershed scale approaches. I believe that, in some substantive way, our GIP efforts a decade ago advanced the cause of sustainable development and moved the state of-the-art of green infrastructure to a more mainstream level,” concludes Paul Ham, Past-Chair (2005-2008) of the Green Infrastructure Partnership. At the time he was General Manager of Engineering with the City of Surrey.
To Download the Time-Line:
CLICK HERE to download a pdf copy of Figure 49 from Beyond the Guidebook 2015. This is complete with a colour-coding legend.
To download a copy of the entire 158-page Beyond the Guidebook 2015, click on this link: https://waterbucket.ca/viw/files/2015/11/Beyond-Guidebook-2015_final_Nov.pdf